| Clarkson Avenue Enhancement Status: Completed Projects Project Contact: Gard Meserve The project widened and resurfaced Clarkson Avenue from the Maple Street intersection southward to the Village limits past Bagdad Road. The new roadway has bicycle lanes on each side and improved pedestrian facilities along the roadway, including to new pedestrian crossings. The project also included new pedestrian facilities at various locations throughout the Village along with bicycle signage that creates a link between Clarkson, Pine Street Arena, SUNY Potsdam, the hospital, and the business from downtown to those located on the northern end of town. Clarkson Avenue Main Entrance Status: Design Phase Project Contact: Gard Meserve Vendor: QPK The existing entrance road into Woodstock Village from Clarkson Avenue will be relocated further south along Clarkson Avenue away from the bottom of the hill to allow better access to the campus. This project also includes; the road from this entrance to the campus loop road, the loop road from the ERC parking lot running east in front of the Science Center going around to the northern side of Snell Hall, and a round-about to the south of the President's House. |
| Clarkson Avenue Enhancement Status: Completed Projects Project Contact: Gard Meserve The project widened and resurfaced Clarkson Avenue from the Maple Street intersection southward to the Village limits past Bagdad Road. The new roadway has bicycle lanes on each side and improved pedestrian facilities along the roadway, including to new pedestrian crossings. The project also included new pedestrian facilities at various locations throughout the Village along with bicycle signage that creates a link between Clarkson, Pine Street Arena, SUNY Potsdam, the hospital, and the business from downtown to those located on the northern end of town. Clarkson Avenue Main Entrance Status: Design Phase Project Contact: Gard Meserve Vendor: QPK The existing entrance road into Woodstock Village from Clarkson Avenue will be relocated further south along Clarkson Avenue away from the bottom of the hill to allow better access to the campus. This project also includes; the road from this entrance to the campus loop road, the loop road from the ERC parking lot running east in front of the Science Center going around to the northern side of Snell Hall, and a round-about to the south of the President's House. |
| Clarkson University's Technology Advancement Center Status: Completed Projects Project Contact: Gard Meserve Vendor: Northeast Construction The $5 million capital project, funded by the State of New York, has been completed. The building includes space for the Division of Research, including technology transfer, as well as renewable energy research and development laboratories. This addition added 15,000 square feet to the building. TAC Sustainability Office Status: Current Construction Project Contact: Gard Meserve |
| Clarkson University's Technology Advancement Center Status: Completed Projects Project Contact: Gard Meserve Vendor: Northeast Construction The $5 million capital project, funded by the State of New York, has been completed. The building includes space for the Division of Research, including technology transfer, as well as renewable energy research and development laboratories. This addition added 15,000 square feet to the building. TAC Sustainability Office Status: Current Construction Project Contact: Gard Meserve |
| Hantz Bleachers Status: Future Projects Project Contact: Gard Meserve The second phase of the Hantz Field construction provides a new grandstand style of seating for the field along with needed landscaping around the field. Walker Parking Front and Rear Status: Future Projects Project Contact: Gard Meserve Reconstruct and reconfigure the parking lot in front and rear of Walker Arena to provide suitable parking for both Walker Arena and Hantz Field. Hantz Field Status: Completed Projects Project Contact: Gard Meserve Vendor: Luck Builders The new artificial turf field designed by QPK Architects is to be completed in two phases, beginning with the field lights, fencing, and the best in class artificial turf field. The turf field measures 285' x 400'. The second phase includes a grandstand/press box with tiered bleachers to accommodate seating for 500 spectators, as well as landscaping, sidewalks, and upgrades to the West Walker Parking lot. Phase I of this project began with development of storm water calculations, grading and site utility plans, and the arrangement of geotechnical exploration relative to general soil rock bed, ground water conditions, and foundation design. Drilling for the field lighting and scoreboard foundations began in winter and re-commenced this spring allowing for the lights to be set up in early April. Field sub-grade remediation plans and logistics are moving forward. Parking lot poles will be reviewed and approved. The stonewall demolition and reconstruction will be coordinated with the Village of Potsdam Bike and Pedestrian Lane project. |
| Hantz Bleachers Status: Future Projects Project Contact: Gard Meserve The second phase of the Hantz Field construction provides a new grandstand style of seating for the field along with needed landscaping around the field. Walker Parking Front and Rear Status: Future Projects Project Contact: Gard Meserve Reconstruct and reconfigure the parking lot in front and rear of Walker Arena to provide suitable parking for both Walker Arena and Hantz Field. Hantz Field Status: Completed Projects Project Contact: Gard Meserve Vendor: Luck Builders The new artificial turf field designed by QPK Architects is to be completed in two phases, beginning with the field lights, fencing, and the best in class artificial turf field. The turf field measures 285' x 400'. The second phase includes a grandstand/press box with tiered bleachers to accommodate seating for 500 spectators, as well as landscaping, sidewalks, and upgrades to the West Walker Parking lot. Phase I of this project began with development of storm water calculations, grading and site utility plans, and the arrangement of geotechnical exploration relative to general soil rock bed, ground water conditions, and foundation design. Drilling for the field lighting and scoreboard foundations began in winter and re-commenced this spring allowing for the lights to be set up in early April. Field sub-grade remediation plans and logistics are moving forward. Parking lot poles will be reviewed and approved. The stonewall demolition and reconstruction will be coordinated with the Village of Potsdam Bike and Pedestrian Lane project. |
| Hantz Bleachers Status: Future Projects Project Contact: Gard Meserve The second phase of the Hantz Field construction provides a new grandstand style of seating for the field along with needed landscaping around the field. Walker Parking Front and Rear Status: Future Projects Project Contact: Gard Meserve Reconstruct and reconfigure the parking lot in front and rear of Walker Arena to provide suitable parking for both Walker Arena and Hantz Field. Hantz Field Status: Completed Projects Project Contact: Gard Meserve Vendor: Luck Builders The new artificial turf field designed by QPK Architects is to be completed in two phases, beginning with the field lights, fencing, and the best in class artificial turf field. The turf field measures 285' x 400'. The second phase includes a grandstand/press box with tiered bleachers to accommodate seating for 500 spectators, as well as landscaping, sidewalks, and upgrades to the West Walker Parking lot. Phase I of this project began with development of storm water calculations, grading and site utility plans, and the arrangement of geotechnical exploration relative to general soil rock bed, ground water conditions, and foundation design. Drilling for the field lighting and scoreboard foundations began in winter and re-commenced this spring allowing for the lights to be set up in early April. Field sub-grade remediation plans and logistics are moving forward. Parking lot poles will be reviewed and approved. The stonewall demolition and reconstruction will be coordinated with the Village of Potsdam Bike and Pedestrian Lane project. |
| Main Entrance / New Parking Lot Status: Completed Projects Project Contact: Gard Meserve This project eliminated approximately 48 parking spaces on the east side of the main entrance road by Ross/Brooks Residence Halls, installed a new drop-off area at Ross/Brooks, and constructed a new 48 space parking lot on the east side of Cubley House. |
| B. H. Snell Basement Upgrade Status: Current Construction Project Contact: Gard Meserve Schematic Design Studies for proposed build out of the existing basement for classrooms, a lobby, access stairs/halls, and a lecture hall addition that will accommodate approximately 250 people. |
| Foster House Mechanical Repairs Status: Design Phase Project Contact: Board of Trustees Reconfigure the existing HVAC system in the building to overcome its existing inadequacies. Foster House Status: Completed Projects Project Contact: Board of Trustees Per original funding and design plan approved by the Trustees, the President’s House project is using historical data and feedback on functions in the home to identify unmet needs and to continue development of the home’s interior and grounds. President's House Entertainment Garden Status: Design Phase Project Contact: Gard Meserve Based on historical patterns for hosting alumni and student events, and projected continued usage of the president’s home to welcome guests of the University, the current garden to the south of the President’s House will be mirrored to double its size to more appropriately accommodate large groups. The garden will be enhanced by a wall, which will honor the memory of Helen Cheel and other significant donors. |
| Foster House Mechanical Repairs Status: Design Phase Project Contact: Board of Trustees Reconfigure the existing HVAC system in the building to overcome its existing inadequacies. Foster House Status: Completed Projects Project Contact: Board of Trustees Per original funding and design plan approved by the Trustees, the President’s House project is using historical data and feedback on functions in the home to identify unmet needs and to continue development of the home’s interior and grounds. President's House Entertainment Garden Status: Design Phase Project Contact: Gard Meserve Based on historical patterns for hosting alumni and student events, and projected continued usage of the president’s home to welcome guests of the University, the current garden to the south of the President’s House will be mirrored to double its size to more appropriately accommodate large groups. The garden will be enhanced by a wall, which will honor the memory of Helen Cheel and other significant donors. |
| Foster House Mechanical Repairs Status: Design Phase Project Contact: Board of Trustees Reconfigure the existing HVAC system in the building to overcome its existing inadequacies. Foster House Status: Completed Projects Project Contact: Board of Trustees Per original funding and design plan approved by the Trustees, the President’s House project is using historical data and feedback on functions in the home to identify unmet needs and to continue development of the home’s interior and grounds. President's House Entertainment Garden Status: Design Phase Project Contact: Gard Meserve Based on historical patterns for hosting alumni and student events, and projected continued usage of the president’s home to welcome guests of the University, the current garden to the south of the President’s House will be mirrored to double its size to more appropriately accommodate large groups. The garden will be enhanced by a wall, which will honor the memory of Helen Cheel and other significant donors. |
| South Cheel / CAMP Parking Status: Future Projects Project Contact: Gard Meserve Vendor: QPK The new parking lot will be constructed in the wooded area located east of the loop road with an additional 190 spaces. This parking lot will service both the Cheel Campus Center and the CAMP buildings. It will be accessible by a road that extends from the maintenance drive, located on the west side of the Cheel building. |
| Student Center Status: Completed Projects Project Contact: Kurt Stimeling Vendor: Pizzagalli Construction Company The Student Center has been built with many student uses in mind including many study rooms and lounges, one large food service area, a bar/cafe area with game room, many different eating areas, Conference and meeting rooms for student groups, a virtual game room, small grocery store, mail room, music practice rooms, facilities for the student newspaper, student radio station, and student television station, a graduate student lounge, international student lounge, and a meditation room. The center of the building is a forum gathering space the full height of the building. It features stepped seating and a large screen television system with a sound system throughout the building. |
| Walker Arena / Locker Room Status: Completed Projects Project Contact: Gard Meserve Vendor: Northeast Construction / Sheehan This renovation project will create a multipurpose recreation venue powered by alternative energy systems that will advance regional educational and economic development priorities. Renovations to the Clarkson University's circa 1930's Walker Arena will include a new roof, new synthetic turf, and the front facade to make the building look as it did nearly 70 years ago. Climbing Wall Status: Projects in the Queue Project Contact: Gard Meserve Provide a new climbing wall facility as an addition to Walker Arena that showcases the waterfront |
| Walker Arena / Locker Room Status: Completed Projects Project Contact: Gard Meserve Vendor: Northeast Construction / Sheehan This renovation project will create a multipurpose recreation venue powered by alternative energy systems that will advance regional educational and economic development priorities. Renovations to the Clarkson University's circa 1930's Walker Arena will include a new roof, new synthetic turf, and the front facade to make the building look as it did nearly 70 years ago. Climbing Wall Status: Projects in the Queue Project Contact: Gard Meserve Provide a new climbing wall facility as an addition to Walker Arena that showcases the waterfront |
| Holcroft Parking Status: Design Phase Project Contact: Gard Meserve Provides additional needed parking for our Admissions building while improving the exterior presence of the building. Holcroft House (Welcome Center) Status: Projects in the Queue Project Contact: Gard Meserve Vendor: QPK The Holcroft House is a former Clarkson family residence currently providing a homey, welcoming approach by the Admissions staff. The new Welcome Center located on the first floor at the Holcroft house will utilize the former living room and adjoining dining room as a display area for Clarkson family memorabilia. Another area of the Welcome Center will provide for three- to- four large interview rooms that can accommodate prospective students and their families as well as other small groups of five- to- six people. |
| Holcroft Parking Status: Design Phase Project Contact: Gard Meserve Provides additional needed parking for our Admissions building while improving the exterior presence of the building. Holcroft House (Welcome Center) Status: Projects in the Queue Project Contact: Gard Meserve Vendor: QPK The Holcroft House is a former Clarkson family residence currently providing a homey, welcoming approach by the Admissions staff. The new Welcome Center located on the first floor at the Holcroft house will utilize the former living room and adjoining dining room as a display area for Clarkson family memorabilia. Another area of the Welcome Center will provide for three- to- four large interview rooms that can accommodate prospective students and their families as well as other small groups of five- to- six people. |
| Woodstock Lodge Renovation Status: Completed Projects Project Contact: Roy Wilson / Skip Leonard Vendor: Sheehan Office renovations were made in the basement level of Woodstock Lodge. During the fall of 2007 the basement was extensively renovated to create new office spaces for The Clarkson Fund, Advancement Services, and Phonathon. The renovation included a new heating and air conditioning system, and new modular walls, which were constructed to create eight new office spaces, five new student work stations, 23 new Phonathon desks, and two support staff stations. Other upgrades included electrical, new lighting, and flooring. |
| Baseball Field Status: Future Projects Project Contact: Gard Meserve |
| Auditorium Status: Concept Project Contact: Gard Meserve |
| Southern Racquette River Walking Trails Status: Current Construction Project Contact: Gard Meserve The DEC is currently reviewing the drawings and phased approach to the Walk Trails, since phase 1 will not include the river boardwalks. It is anticipated that some exploratory work will commence this fall and construction will begin during the late spring of 2009. |
| Paid Cheel Lot Extension Status: Future Projects Project Contact: Gard Meserve Reconfiguration and addition to the existing lower Cheel parking lot to accommodate additional parking on campus. The project will net about 30 additional parking spots |
| Price Hall Exterior Status: Current Construction Project Contact: Gard Meserve Price Administrative Renovations Status: Current Construction Project Contact: Gard Meserve Vendor: CU Staff The Price Hall Phase II renovations include construction on the 2nd floor to create a new space for the Clarkson School and Honors Program. The renovation includes administrative offices for the two programs and a classroom near the Clarkson School student dorms. A new entrance for the program is planned as well to represent the identity of the program as well as make it more visible on the campus. |
| Price Hall Exterior Status: Current Construction Project Contact: Gard Meserve Price Administrative Renovations Status: Current Construction Project Contact: Gard Meserve Vendor: CU Staff The Price Hall Phase II renovations include construction on the 2nd floor to create a new space for the Clarkson School and Honors Program. The renovation includes administrative offices for the two programs and a classroom near the Clarkson School student dorms. A new entrance for the program is planned as well to represent the identity of the program as well as make it more visible on the campus. |
| Cheel Multipurpose Rooms Status: Concept Project Contact: Gard Meserve |
| CAMP Future Addition Status: Concept Project Contact: Gard Meserve |
| Center for Environment Display Status: Completed Projects Project Contact: Ian Hazen Vendor: Kevan Moss An exhibit in CAMP Atrium Building, which will include antique air sampling instruments that measure particles of dust in the air. The display will include two display cases that have the antique air sampling instruments in them with minimal text describing the instruments. |
| Observatory Status: Concept Project Contact: Gard Meserve |
| Campus Loop Road Status: Concept Project Contact: Gard Meserve This project includes a new roadway from the western Route 11 entrance and a turnaround. This project also includes a northwest parking area and landscaping to blend into the main Cheel parking area. Provides a rehabilitation to our existing roads and parking ltos to correct deficiencies. |
| Theme/Greek Housing (3 Units) Status: Design Phase Project Contact: Gard Meserve An area southwest of the Townhouse Apartments will be developed to accommodate fraternity and sorority living as well as theme group functions. Campus Infrastructure with Retention Pond Status: Design Phase Project Contact: Gard Meserve Extend gas, water, sewer, and electric and road system for future greek/theme housing. Project also includes the construction of a stormwater retention pond to mitigate storm water runoff. |
| Theme/Greek Housing (3 Units) Status: Design Phase Project Contact: Gard Meserve An area southwest of the Townhouse Apartments will be developed to accommodate fraternity and sorority living as well as theme group functions. Campus Infrastructure with Retention Pond Status: Design Phase Project Contact: Gard Meserve Extend gas, water, sewer, and electric and road system for future greek/theme housing. Project also includes the construction of a stormwater retention pond to mitigate storm water runoff. |
| Woodstock Village Renovation (1 Unit) Status: Current Construction Project Contact: Gard Meserve Vendor: CU Staff The Woodstock Village apartments will be updated to create more beds per apartment as well as add new finishes and equipment. Building #6 will be completed first as a sample project. The exterior of the buildings are to be renovated to resemble the “Adirondack style.” Woodstock Village (4 Units) Status: Design Phase Project Contact: Gard Meserve Continue renovating the remaining 9 units of Woodstock Village in the same "Adirondack" inspired design as is currently being done for building #6. This renovation involves both the interior and exterior along with significant energy reducing measures. Woodstock Village (5 Units) Status: Projects in the Queue Project Contact: Gard Meserve |
| Woodstock Village Renovation (1 Unit) Status: Current Construction Project Contact: Gard Meserve Vendor: CU Staff The Woodstock Village apartments will be updated to create more beds per apartment as well as add new finishes and equipment. Building #6 will be completed first as a sample project. The exterior of the buildings are to be renovated to resemble the “Adirondack style.” Woodstock Village (4 Units) Status: Design Phase Project Contact: Gard Meserve Continue renovating the remaining 9 units of Woodstock Village in the same "Adirondack" inspired design as is currently being done for building #6. This renovation involves both the interior and exterior along with significant energy reducing measures. Woodstock Village (5 Units) Status: Projects in the Queue Project Contact: Gard Meserve |
| Woodstock Village Renovation (1 Unit) Status: Current Construction Project Contact: Gard Meserve Vendor: CU Staff The Woodstock Village apartments will be updated to create more beds per apartment as well as add new finishes and equipment. Building #6 will be completed first as a sample project. The exterior of the buildings are to be renovated to resemble the “Adirondack style.” Woodstock Village (4 Units) Status: Design Phase Project Contact: Gard Meserve Continue renovating the remaining 9 units of Woodstock Village in the same "Adirondack" inspired design as is currently being done for building #6. This renovation involves both the interior and exterior along with significant energy reducing measures. Woodstock Village (5 Units) Status: Projects in the Queue Project Contact: Gard Meserve |
| Moore House Green Space for Walking Campus Status: Future Projects Project Contact: Gard Meserve Vendor: U.W. Marx Future green space between the ERC and Moore House which will replace the current road and parking lot |
| Moore House Renovations Status: Current Construction Project Contact: Gard Meserve Vendor: U.W. Marx The Moore House renovations include a 4th floor addition on each wing with dorm suites for upperclassmen. The additions are scheduled to be completed by August 2011 in order for students to begin using them as residences in the Fall semester of 2011. The center core portion of the project includes a conference space and patio. The project also includes updates to the exterior finishes including masonry, siding, and windows. This portion of the project will continue throughout the winter and is expected to be complete in the summer of 2012. |
| Graham Administrative Renovation Status: Completed Projects Project Contact: Gard Meserve Vendor: CU Staff This project includes renovating the center core of the building to consolidate various student services and administrative offices into one facility in order to increase efficiency. The completed Phase 1 portion of the renovation included office spaces on the first floor for the Human Resources department, Helpdesk, and Payroll. The Phase II portion includes administrative offices for Risk Management, Student Administrative Services, Accounts Payable, Finance, and Purchasing, as well as a conference room and lunch room. It is expected to be completed in the summer of 2011. |
| Racquette River Athletic Field Status: Concept Project Contact: Gard Meserve This will be located directly east of the President's House and will be developed to take advantage of the scenic view. This project could include an amphitheater, stadium, garden, exercise stations, gazebo, boat docks, and scenic overlooks. |
| Physical Plant Demolition Status: Design Phase Project Contact: Gard Meserve Removal of the existing physical plant to allow the development of the waterfront property and minimize safety issues regarding university equipment crossing the public roadway. The project will also assess the feasibility of reusing the materials to rebuild it at a new location. |
| Physical Plant Relocation Status: Projects in the Queue Project Contact: Gard Meserve The existing Physical Plant buildings and operation will be relocated from the Clarkson Avenue location to the property south of non-university property off Route 11. The purpose of this relocation is twofold: it will minimize safety issues regarding university equipment crossing the public roadway, and it will allow development of the waterfront property. |
| Freshman Quad 4th Floor Addition Status: Completed Projects Project Contact: Gard Meserve Vendor: U.W. Marx The Freshman Quad Project consists of an addition to each of the 4 freshman dormatories. This project added a new 4th floor to each building with dormers to enhance the look of the buildings as well as house an additional 84 students. The project designed by Perkins and Will adds to the aesthetics and cohesiveness of the Clarkson University campus. |
| ERC-Library Completion/Atrium/Schuler Status: Future Projects Project Contact: Gard Meserve Aesthetic renovations of the library will be made in order to create a more welcoming and comfortable study space for students to gather and complete their group or individual work. This project will include items reported by the Library Task Force such as lighting, artwork, study rooms, library classrooms, and a more attractive interior design. ERC Renovation Status: Completed Projects Project Contact: Gard Meserve |
| ERC-Library Completion/Atrium/Schuler Status: Future Projects Project Contact: Gard Meserve Aesthetic renovations of the library will be made in order to create a more welcoming and comfortable study space for students to gather and complete their group or individual work. This project will include items reported by the Library Task Force such as lighting, artwork, study rooms, library classrooms, and a more attractive interior design. ERC Renovation Status: Completed Projects Project Contact: Gard Meserve |
| Hamlin-Powers 4th Floor Addition Status: Completed Projects Project Contact: Gard Meserve Vendor: U.W. Marx The addition to the Hamlin-Powers Dormitories will follow the precedent set by the Quad addition completed in the summer of 2009. This features a 4th floor with individual dormers to create single rooms. The back differs from the Quad with a shed dormer that will maximize space and allow for rooms to fit on both sides of the building with a hallway in the middle. Other possible additions include a patio area in the front green space with possible apartment style living areas in the center core of the building. |
| Nab Lab Status: Current Construction Project Contact: Gard Meserve Vendor: Pizzagalli The new Nablab facility will be an extension to the existing CAMP-Rowley building complex. The project will add one classroom that will seat 56 students, 8 labs, 1 conference room, 10 offices, 1 hazardous material room, as well as a first floor walkway connector. |
| Cheel Locker Room Renovations Status: Completed Projects Project Contact: Gard Meserve Vendor: Clarkson University With this project we are creating a seperate changing area in the men's locker room, installing new lockers, relocating existing benches, and installing a new entrance. Our Place Renovation Status: Completed Projects Project Contact: Gard Meserve Vendor: Northern Mechanical Relocate pizza oven and exhaust hood from Bene Pizza to Our Place and add a new exhaust hood to accomodate additional equipment. This will allow Our Place to serve pizza, pasta, BBQ, and salads. Cheel Renovation Status: Design Phase Project Contact: Gard Meserve Design and construct 2 wing additions onto Cheel. ROTC on the Hill Status: Projects in the Queue Project Contact: Gard Meserve Daycare Status: Future Projects Project Contact: Gard Meserve |
| Cheel Locker Room Renovations Status: Completed Projects Project Contact: Gard Meserve Vendor: Clarkson University With this project we are creating a seperate changing area in the men's locker room, installing new lockers, relocating existing benches, and installing a new entrance. Our Place Renovation Status: Completed Projects Project Contact: Gard Meserve Vendor: Northern Mechanical Relocate pizza oven and exhaust hood from Bene Pizza to Our Place and add a new exhaust hood to accomodate additional equipment. This will allow Our Place to serve pizza, pasta, BBQ, and salads. Cheel Renovation Status: Design Phase Project Contact: Gard Meserve Design and construct 2 wing additions onto Cheel. ROTC on the Hill Status: Projects in the Queue Project Contact: Gard Meserve Daycare Status: Future Projects Project Contact: Gard Meserve |
| Cheel Locker Room Renovations Status: Completed Projects Project Contact: Gard Meserve Vendor: Clarkson University With this project we are creating a seperate changing area in the men's locker room, installing new lockers, relocating existing benches, and installing a new entrance. Our Place Renovation Status: Completed Projects Project Contact: Gard Meserve Vendor: Northern Mechanical Relocate pizza oven and exhaust hood from Bene Pizza to Our Place and add a new exhaust hood to accomodate additional equipment. This will allow Our Place to serve pizza, pasta, BBQ, and salads. Cheel Renovation Status: Design Phase Project Contact: Gard Meserve Design and construct 2 wing additions onto Cheel. ROTC on the Hill Status: Projects in the Queue Project Contact: Gard Meserve Daycare Status: Future Projects Project Contact: Gard Meserve |
| Cheel Locker Room Renovations Status: Completed Projects Project Contact: Gard Meserve Vendor: Clarkson University With this project we are creating a seperate changing area in the men's locker room, installing new lockers, relocating existing benches, and installing a new entrance. Our Place Renovation Status: Completed Projects Project Contact: Gard Meserve Vendor: Northern Mechanical Relocate pizza oven and exhaust hood from Bene Pizza to Our Place and add a new exhaust hood to accomodate additional equipment. This will allow Our Place to serve pizza, pasta, BBQ, and salads. Cheel Renovation Status: Design Phase Project Contact: Gard Meserve Design and construct 2 wing additions onto Cheel. ROTC on the Hill Status: Projects in the Queue Project Contact: Gard Meserve Daycare Status: Future Projects Project Contact: Gard Meserve |
| Cheel Locker Room Renovations Status: Completed Projects Project Contact: Gard Meserve Vendor: Clarkson University With this project we are creating a seperate changing area in the men's locker room, installing new lockers, relocating existing benches, and installing a new entrance. Our Place Renovation Status: Completed Projects Project Contact: Gard Meserve Vendor: Northern Mechanical Relocate pizza oven and exhaust hood from Bene Pizza to Our Place and add a new exhaust hood to accomodate additional equipment. This will allow Our Place to serve pizza, pasta, BBQ, and salads. Cheel Renovation Status: Design Phase Project Contact: Gard Meserve Design and construct 2 wing additions onto Cheel. ROTC on the Hill Status: Projects in the Queue Project Contact: Gard Meserve Daycare Status: Future Projects Project Contact: Gard Meserve |
| Hamlin Powers Old Health Center Renovation Status: Completed Projects Project Contact: Gard Meserve Vendor: Clarkson University Renovate the old health center area and basement in the Hamlin Powers center core to create 24 new beds. |
| Hamlin-Powers Parking Renovation Status: Completed Projects Project Contact: Gard Meserve Vendor: Perras Excavating, Inc. Expansion and reconfiguration of existing parking lot. Work includes changes to curbing and sidewalks around Powers to improve safety and pedestrian traffic. |
| Science Center Biotechnology Lab Status: Completed Projects Project Contact: Gard Meserve Science Center Lecture Hall Renovation Status: Projects in the Queue Project Contact: Gard Meserve |
| Science Center Biotechnology Lab Status: Completed Projects Project Contact: Gard Meserve Science Center Lecture Hall Renovation Status: Projects in the Queue Project Contact: Gard Meserve |
| Softball Field Construction Status: Future Projects Project Contact: Gard Meserve |
| Clarkson Mausoleum Status: Completed Projects Project Contact: Gard Meserve Vendor: R.E. Kelly The restoration of the Clarkson Family Mausoleum in the Bayside Cemetery, Potsdam, New York, will include rebuilding, repainting, and cleaning of the deteriorated stones. |
| Current Construction 2 - TAC Sustainability Office 5 - B. H. Snell Basement Upgrade 15 - Southern Racquette River Walking Trails 17 - Price Hall Exterior 17 - Price Administrative Renovations 26 - Woodstock Village Renovation (1 Unit) 29 - Moore House Renovations 39 - Nab Lab |
Design Phase 1 - Clarkson Avenue Main Entrance 6 - Foster House Mechanical Repairs 6 - President's House Entertainment Garden 10 - Holcroft Parking 23 - Theme/Greek Housing (3 Units) 23 - Campus Infrastructure with Retention Pond 26 - Woodstock Village (4 Units) 33 - Physical Plant Demolition 40 - Cheel Renovation |
Projects in the Queue 9 - Climbing Wall 10 - Holcroft House (Welcome Center) 26 - Woodstock Village (5 Units) 35 - Physical Plant Relocation 40 - ROTC on the Hill 43 - Science Center Lecture Hall Renovation |
| Future Projects 3 - Hantz Bleachers 3 - Walker Parking Front and Rear 7 - South Cheel / CAMP Parking 12 - Baseball Field 16 - Paid Cheel Lot Extension 28 - Moore House Green Space for Walking Campus 37 - ERC-Library Completion/Atrium/Schuler 40 - Daycare 44 - Softball Field Construction |
Concept 14 - Auditorium 18 - Cheel Multipurpose Rooms 19 - CAMP Future Addition 21 - Observatory 22 - Campus Loop Road 32 - Racquette River Athletic Field |
Completed Projects 1 - Clarkson Avenue Enhancement 2 - Clarkson University's Technology Advancement Center 3 - Hantz Field 4 - Main Entrance / New Parking Lot 6 - Foster House 8 - Student Center 9 - Walker Arena / Locker Room 11 - Woodstock Lodge Renovation 20 - Center for Environment Display 30 - Graham Administrative Renovation 36 - Freshman Quad 4th Floor Addition 37 - ERC Renovation 38 - Hamlin-Powers 4th Floor Addition 40 - Cheel Locker Room Renovations 40 - Our Place Renovation 41 - Hamlin Powers Old Health Center Renovation 42 - Hamlin-Powers Parking Renovation 43 - Science Center Biotechnology Lab 45 - Clarkson Mausoleum |